How to Estimate Restaurant Fit-Out Costs in Dubai Before Signing a Lease
Updated: 23 hours ago
To estimate the cost of fitting out a restaurant in Dubai, start with the menu, equipment and condition of the unit. A coffee bar serving bought-in pastries and a restaurant cooking over a grill can occupy the same floor area and need very different building work. Build an estimate for each shortlisted unit so you can compare what it will take to open the doors.

Café interior concept with timber chairs, pendant lights and tall arched windows.
Make a kitchen equipment list before asking for a rate
Write down what will arrive ready to serve and what your team will prepare or cook on site. List major equipment and flag anything that may need dedicated power, water, drainage, gas or extraction. A short list of equipment with proposed locations gives a consultant a better basis for an early estimate than the number of seats alone.
Give your designer the opening menu and any cooking you plan to add later. A change from reheating to full cooking can affect the works you need to allow for.
Ask what the unit can support
Request the landlord’s fit-out guide, available services drawings and a written handover schedule. Ask a fit-out consultant to check what power and cooling are available, whether a suitable exhaust route exists and what is known about drainage and grease management. If a previous tenant left equipment or ductwork, get its condition and suitability checked before assigning it a value in the budget.
Dubai Municipality lists a layout assessment service for food establishment licensing. Ask your consultant and building management to confirm the applicable approvals and who handles each submission.
Separate construction from the rest of the opening budget
Set up separate lines for design and approvals, strip-out and construction, building services, kitchen equipment and installation, furniture and signage. List lease deposits, rent during the works and any temporary operating costs separately so you can see how much cash you need before opening.
Use the café material board as a reference for agreeing which finishes are important to the concept and where you can consider alternatives before contractors price the same schedule.
Compare quotes on the same basis
Give each contractor the same plan, equipment schedule and written scope. For each quote, mark what is included, excluded or allowed for provisionally. If one contractor includes commissioning the extract system and another excludes it, ask for that item as a separate price before comparing totals.
List each unresolved cost beside the person who can confirm it. Start with anything that could change your choice of unit, such as a new services route or landlord works that would affect your opening date.